Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
PENNSYLVANIA | PHILADELPH-WILMINGTON (PA-DE-NJ-MD) | Establish gateway medians and install trees to delineate entranceways to the Village Shopping Districts and the Valley Green Road Commercial Center in Springfield and Whitemarsh Townships | Transportation Enhancements | $273,000 |
PENNSYLVANIA | PHILADELPH-WILMINGTON (PA-DE-NJ-MD) | Pavement Preservation, Bridge Deck Repair and Parapet Repair of Interstate 476 in Plymouth Township and West Conshohocken Borough | Pavement Improvement | $33,663,084 |
PENNSYLVANIA | PHILADELPH-WILMINGTON (PA-DE-NJ-MD) | STATE ROUTE 0076, SECTION RMP, IN MONTGOMERY COUNTY, UPPER MERION | PROJECT INVOLVES CONSTRUCTION OF A NEW SR 0076 WEST OFF-RAMP ( | Pavement Improvement | $14,238,178 |
PENNSYLVANIA | PHILADELPH-WILMINGTON (PA-DE-NJ-MD) | Construction of ADA Curb Ramps in various locations of Philadelphia County | Transportation Enhancements | $1,605,428 |
PENNSYLVANIA | PHILADELPH-WILMINGTON (PA-DE-NJ-MD) | Resurface and Base Repairs, Upgrades to Curb Ramps and Crosswalks and partial reconstruction of Creishem Valley Drive | Transportation Enhancements | $7,239,539 |
PENNSYLVANIA | PHILADELPH-WILMINGTON (PA-DE-NJ-MD) | Preservation of Girard Point Bridge on Interstate 95 in the City of Philadelphia | Bridge Improvement | $65,849,409 |
PENNSYLVANIA | Concrete patching, joint repair and resurfacing on US Route 15 from State Route 94 York Springs exit to State Route 234 Heidlersburg exit in Huntington, Tyrone and Latimore Townships | Pavement Improvement | $6,785,000 | |
PENNSYLVANIA | Replacement on State Route 34 (Spring Road) over Conodoguinet Creek in North Middleton Township | Bridge Replacement | $1,949,460 | |
PENNSYLVANIA | Resurfacing of Interstate 81 from State Route 74 exit 48 to Dauphin County Line in South Middleton, Middlesex, Silver Spring, Hampden, East Petersburg Townships and Carlisle Borough | Pavement Improvement | $5,438,077 | |
PENNSYLVANIA | HARRISBURG | Preservation of the US Route 15 Bridge over State Route 114 in Upper Allen Township | Bridge Improvement | $3,559,935 |
PENNSYLVANIA | Concrete pavement patching, joint repair and resurfacing on US Route 30 from Norlo Road to the Adams County Line in Guilford and Greene Townships | Pavement Improvement | $3,258,000 | |
PENNSYLVANIA | YORK | Resurfacing US Route 30 from the Hellam Interchange to the Lancaster County Line in Hellam Township | Pavement Improvement | $3,650,372 |
PENNSYLVANIA | Resurfacing on US Route 30 from State Route 3012 (Jack Road) to Hilltop Drive in St Thomas and Hamilton Townships | Pavement Improvement | $3,324,510 | |
PENNSYLVANIA | YORK | Installation of Traffic Advisory Radios and signing for ITS in various locations of York County | Safety/Traffic Management | $2,457,000 |
PENNSYLVANIA | YORK | Resurfacing and Bridge Preservation of US Route 30 from Interstate 83 to State Route 24 in Manchester and Springettsbury Townships | Pavement Improvement | $7,500,000 |
PENNSYLVANIA | Resurfacing and guiderail work from State Route 25 from Gratz Borough to Schuylkill County line in Gratz Borough and Lykens Township | Pavement Improvement | $2,389,445 | |
PENNSYLVANIA | Bridge Parapet Repairs on Various State Routes in Dauphin County | Safety/Traffic Management | $5,283,850 | |
PENNSYLVANIA | HARRISBURG | Install traffic advisory radios, cameras and signing for ITS in Dauphin County | Safety/Traffic Management | $1,027,000 |
PENNSYLVANIA | HARRISBURG | Resurfacing of Interstate 83 from south of Union Deposit Road interchange to Bridge over Valley Road in Lower Paxton Township | Pavement Improvement | $3,360,000 |
PENNSYLVANIA | HARRISBURG | Widen to five lanes from Old Jonestown Road to Fairville Avenue and widen to three lanes from Fairville Avenue toward Linglestown; install traffic signals, and perform Bridge preservation on State Rou | Pavement Widening | $10,700,000 |
PENNSYLVANIA | LANCASTER | Bridge Rehabilitation on State Route 324 over Pequea Creek in Pequea and Martic Townships | Bridge Improvement | $1,686,041 |
PENNSYLVANIA | Bridge Rehabilitation of 11 different bridges on various state routes in Adams, Cumberland, Lancaster, Franklin, York Counties | Safety/Traffic Management | $2,160,928 | |
PENNSYLVANIA | LANCASTER | Install traffic advisory radios, signing and cameras for ITS in Lancaster County | Safety/Traffic Management | $2,179,000 |
PENNSYLVANIA | LANCASTER | Resurfacing and shoulder repair on US Route 222 from north of Bushong Road to US Route 322 in Ephrata, Manheim, Warwick and West Earl Townships | Pavement Improvement | $12,922,035 |
PENNSYLVANIA | Concrete patching, base repair, resurfacing and new guiderail on US Route 222 from Quarryville to Brennenman Road in Providence and Strasburg Townships and Quarryville Borough | Pavement Improvement | $3,190,677 | |
PENNSYLVANIA | Resurfacing and Safety improvements on US Route 22 from Lincoln School Road to Lancaster Street including State Route 72 interchange in East Hanover, Union and Swatara Townships | Pavement Improvement | $6,500,000 | |
PENNSYLVANIA | Resurfacing on State Route 274 from State Route 850 to Centre/Spring Township Line in Tyrone and Spring Townships | Pavement Improvement | $1,112,947 | |
PENNSYLVANIA | Resurfacing of State Route 30 from Stony Lane (T-720) to the Snake Spring Twp Line in Bedford Township and Bedford Borough | Pavement Improvement | $6,728,697 | |
PENNSYLVANIA | Preservation of 20 bridges in Bedford, Blair, Cambria, Fulton, Huntingdon and Somerset Counties | Bridge Improvement | $4,966,587 | |
PENNSYLVANIA | Bridge deck replacements for various structures in Bedford County | Bridge Improvement | $287,267 | |
PENNSYLVANIA | Rehabilitation of 2 bridges on State Route 915 over Sandy Run in Broadtop Township | Bridge Improvement | $1,468,000 | |
PENNSYLVANIA | ALTOONA | Resurfacing, Guiderail Upgrades and ADA curb ramps on State Route 1001 from Convention Center Blvd north to 3rd Street and on State Route 36 from Pine St (T-612) to Plank Rd (State Route 1001) in Alle | Pavement Improvement | $3,493,000 |
PENNSYLVANIA | ALTOONA | Pavement Restoration and Curb Ramps on Penn Street (State Route 36) from Chimney Rocks Road to Pine Street in Hollidaysburg Borough | Pavement Improvement | $2,925,000 |
PENNSYLVANIA | ALTOONA | Bridge Preservation to various bridges in Snyder, Antis Townships and Tyrone Borough | Bridge Improvement | $2,920,000 |
PENNSYLVANIA | JOHNSTOWN | Bridge preservation of 3 bridges: State Route 1021 over Wyerough Run; State Route 1026 over Slate Lake Run; State Route 4024 over Chest Creek in White and Chest Township | Bridge Improvement | $1,153,476 |
PENNSYLVANIA | JOHNSTOWN | Resurfacing of US Route 219 from Galleria Drive to Palestine Road including Rehabilitation of Palestine Road Bridge in Adams and Richland Townships | Pavement Improvement | $8,788,000 |
PENNSYLVANIA | Rehabilitation of 2 bridges on Manor Drive (State Route 1001) over R. J. Corman Railroad near the intersection of Munster Rd (State Route 1003) and over R. J. Corman Railroad near the intersection of | Bridge Improvement | $1,143,000 | |
PENNSYLVANIA | Rehabilitation of 3 bridges: State Route 1003 over Cove Creek, State Route 3006 over Little Tonoloway, and State Route 4004 over Wooden Bridge Creek in Ayr and Bethel Townships | Bridge Improvement | $588,000 | |
PENNSYLVANIA | Resurfacing of US Route 30 from Bedford County line to the Truck Pull-off in Brush Creek Township | Pavement Improvement | $677,820 | |
PENNSYLVANIA | Bridge Replacement of State Route 1010 Huntingdon Borough Bridge over Standing Stone Creek in Huntingdon Borough | Bridge Replacement | $1,416,753 | |
PENNSYLVANIA | Resurfacing of US Route 22 from Old Twenty-two Road (T-613) to Walnut Terrace Road (T-561) in Smithfield and Porter Townships | Pavement Improvement | $1,139,948 | |
PENNSYLVANIA | Resurfacing of US Route 30 from Westmoreland County Line to State Route 985 in Jenner Township and Jennerstown Borough | Pavement Improvement | $1,407,447 | |
PENNSYLVANIA | Replacement of 3 bridges and Preservation of 2 bridges on State Route 2019 and State Route 2021 over Shaffers Run in Fairhope Township | Bridge Replacement | $2,670,571 | |
PENNSYLVANIA | Removal of bridge over Wilber Coal Company Coal Mine Railroad bridge in Quemahoning Township | Bridge Replacement | $370,000 | |
PENNSYLVANIA | Preservation of State Route 3023 Iron Bridge over Buffalo Creek in South Buffalo Township | Bridge Improvement | $400,000 | |
PENNSYLVANIA | Resurfacing US Route 422 from west of US Route 422/State Route 2009 Intersection to east of the US Route 422/State Route 1015 Intersection in Worthington Borough and West Franklin Township, Armstrong | Pavement Improvement | $5,400,000 | |
PENNSYLVANIA | PITTSBURGH , PA | Restoration of State Route 28 from State Route 3023 to State Route 128 in South Buffalo and North Buffalo Townships | Pavement Improvement | $6,510,800 |
PENNSYLVANIA | Rehabilitation of 2 bridges carrying US Route 422 Eastbound and Westbound over State Route 28 ramps in East Franklin Township | Bridge Improvement | $4,550,000 | |
PENNSYLVANIA | Resurfacing, widening of approximately 1 mile portion of the existing Roaring Run Trail in the Village of Edmon including construction of a rest room facility in Kiskiminetas Township | Transportation Enhancements | $780,000 | |
PENNSYLVANIA | Preservation of State Route 528 bridge over Connoquenessing Creek in Forward Township | Bridge Improvement | $500,000 | |
PENNSYLVANIA | Preservation of State Route 2023 bridge over Little Buffalo Creek in Buffalo Township | Bridge Improvement | $975,000 | |
PENNSYLVANIA | Rehabilitataion of State Route 3027 bridge over Connoquenessing Creek and B & O Railroad in Jackson Township | Bridge Replacement | $5,700,000 | |
PENNSYLVANIA | Rehabilitation, Restoration and Resurfacing of US Route 422 from a point near Whipporwill Road to a point near the State Route 356 Exit in Franklin and Connoquenssing Townships | Pavement Improvement | $2,163,200 | |
PENNSYLVANIA | Bridge Deck Replacement of State Route 4007 bridge over Interstate 79 in Muddy Creek Township | Bridge Improvement | $3,640,000 | |
PENNSYLVANIA | Bridge Rehabilitation of State Route 8006 over Interstate 80 in Paint Township | Bridge Improvement | $6,915,000 | |
PENNSYLVANIA | Preservation of State Route 66 McGregor Road Bridge over Little Piney Creek in Limestone Township | Bridge Improvement | $860,000 | |
PENNSYLVANIA | Replacement of PA 28 Hawthorn Bridge over Pine Creek in Redbank Township | Bridge Replacement | $2,200,000 | |
PENNSYLVANIA | Resurfacing of US Route 119 from State Route 2023 (Lucerne Road) to State Route 56 (Ridge Avenue) in Center Township | Pavement Improvement | $1,050,000 | |
PENNSYLVANIA | Bridge Deck Rehabilitation of US Route 422 over Chestnut Ridge Road (T-840) in Cherryhill Township | Bridge Improvement | $3,705,000 | |
PENNSYLVANIA | Preservation of State Route 3011 Hamilton bridge over Little Mahoning Creek in Perry Township | Bridge Improvement | $700,000 | |
PENNSYLVANIA | Rehabilitation of State Route 2023 over Conrail Railroad in Pine Creek Township | Bridge Improvement | $1,110,000 | |
PENNSYLVANIA | Resurfacing of State Route 36 from Main Street to Newcome Road (T-402) in Punxsutawney Borough and Young, Perry and Oliver Townships | Pavement Improvement | $2,060,000 | |
PENNSYLVANIA | PITTSBURGH , PA | Reconstruction of the Interchange, installation of 2 new signals, signal work and signing in Robinson and North Fayette Townships | Pavement Improvement | $12,153,043 |
PENNSYLVANIA | PITTSBURGH , PA | Bridge Restoration and approach work of Ft. Duquesne Bridge in City of Pittsburgh | Bridge Improvement | $26,190,521 |
PENNSYLVANIA | PITTSBURGH , PA | Rehabilitation of the Rochester Bridge over Beaver River in Rochester and Bridgewater Boroughs | Bridge Improvement | $11,410,227 |
PENNSYLVANIA | Resurfacing of US Route 422 (Ben Franklin Highway) from Pine Glen Road to Zoccoli Road in Mahoning and Pulaski Townships | Pavement Improvement | $2,800,518 | |
PENNSYLVANIA | Bridge Rehabilitation of State Route 2004 (Grove Street) bridge over Neshannock Creek in City of New Castle | Bridge Improvement | $3,491,447 | |
PENNSYLVANIA | UNIONTOWN-CONNELLSVILLE | Replace strip seal dams and make repairs to deck, beam ends, fatigue cracks, concrete beams and headwalls of various State Route bridges in Fayette, Greene, Washington and Westmoreland Counties | Bridge Improvement | $1,400,000 |
PENNSYLVANIA | Replacement of State Route 3006 bridge over York Run in Nicholson Township | Bridge Replacement | $1,900,000 | |
PENNSYLVANIA | Bridge Replacement of State Route 1054 bridge over Trout Run Creek in Saltlick Township | Bridge Replacement | $1,845,101 | |
PENNSYLVANIA | UNIONTOWN-CONNELLSVILLE | Replacement of State Route 1039 bridge over Dickerson Run in Dunbar Township | Bridge Replacement | $862,000 |
PENNSYLVANIA | UNIONTOWN-CONNELLSVILLE | Restoration of of US Route 119 from Penn State Fayette to Pechin Road in North Union and Dundar Townships | Pavement Improvement | $5,365,000 |
PENNSYLVANIA | Replacement of State Route 18 over Branch of Browns Run in Morris Township | Bridge Replacement | $1,200,000 | |
PENNSYLVANIA | Replacement of State Route 18 bridge over Garners Run in Washington Township | Bridge Replacement | $1,113,000 | |
PENNSYLVANIA | Replacement of ADA Curb Ramps at various locations throughout PennDOT District 12 | Transportation Enhancements | $2,080,000 | |
PENNSYLVANIA | Replacement of State Route 4029 over Cross Creek in Cross Creek Township | Bridge Replacement | $1,225,000 | |
PENNSYLVANIA | Highway Restoration of US Route 19 from Conklin Road to State Route 519 in North Strabane Township | Pavement Improvement | $1,250,000 | |
PENNSYLVANIA | PITTSBURGH , PA | Pavement Restoration of State Route 30 from Theater Street to State Route 217 in Unity Township | Pavement Improvement | $2,979,000 |
PENNSYLVANIA | PITTSBURGH , PA | Restoration of US Route 30 from Black Hills Road to Walton Tea Room Road in Hempfield Township | Pavement Improvement | $3,433,000 |
PENNSYLVANIA | MONESSEN | Preservation of State Route 201 bridge over Interstate 70 in Rostraver Township | Bridge Improvement | $840,000 |
PENNSYLVANIA | Replacement of State Route 1006 bridge over Tub Mill Creek in Fairfield Township | Bridge Replacement | $842,000 | |
PENNSYLVANIA | PITTSBURGH , PA | Rehabilitation of State Route 993 bridge over Brush Creek in North Huntingdon Township | Bridge Improvement | $2,770,000 |
PENNSYLVANIA | Replacement of State Route 201 bridge over Pollock Run in Rostraver Township | Bridge Replacement | $1,035,000 | |
PENNSYLVANIA | PITTSBURGH , PA | Preservation of Walworth Bridge on US Route 30 in South Greensburg and Southwest Greensburg Boroughs | Bridge Improvement | $2,000,000 |
PENNSYLVANIA | MONESSEN | Bridge Preservation including Bearing Rehabilitation, Scour Protection and Painting of State Route 981 bridge over Yougiogheny River and Bike Trail in Rostraver and South Huntingdon Townships | Bridge Improvement | $295,000 |
PENNSYLVANIA | MONESSEN | Upgrade 6 Signalized intersections along State Route 201 in Rostraver Township | Safety/Traffic Management | $345,000 |
PUERTO RICO | AGUDILLA | Bridge Replacement Num. 763, PR-2, km. 127.4 (PR-2 Access) | Pavement Improvement | $7,396,021 |
PUERTO RICO | PONCE | Convertion to Expressway PR-2, Interchange with Punto Oro Avenue, from km 223.09to km. 224.08 Stage 6, Phase II | Pavement Widening | $25,722,760 |
PUERTO RICO | SAN JUAN | Beam Bearing Repair Bridge 1875 PR-20 | Bridge Improvement | $762,680 |
PUERTO RICO | MAYAGUEZ | Mayaguez West By-Pass | Pavement Widening | $15,536,566 |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs South Region - UNIT I | Pavement Improvement | $2,016,000 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs East Region - UNIT I | Pavement Improvement | $3,632,308 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs Metro Region | Pavement Improvement | $3,004,260 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs South Region - UNIT II | Pavement Improvement | $5,354,400 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs South Region - UNIT III | Pavement Improvement | $4,434,400 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs East Region - UNIT II | Pavement Improvement | $3,394,007 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs East - UNIT III | Pavement Improvement | $2,265,862 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs East - UNIT IV | Pavement Improvement | $1,207,052 | |
PUERTO RICO | Reconstruction of Highways on Metropolitan Region, Contract Unit No. II | Pavement Improvement | $2,477,399 | |
PUERTO RICO | Pavement Rehabilitation and Minor Repairs Metro Region - UNIT III | Pavement Improvement | $4,072,163 | |
RHODE ISLAND | This project is the final phase of a Safety Improvement Project. Project includes excavating planting beds, placing loam and installing new planting material in select locations in the U.S. Route 1 m | Pavement Improvement | $156,982 | |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | Replacement of all signage on Route 10 from Park Ave./Route 12 in Cranston to I-95 in Providence (5 miles). | Safety/Traffic Management | $5,047,069 |
RHODE ISLAND | Rehabilitation of bridges at the Dillons Corner Rotary in Narragansett. Work to consist of superstructure replacement of Dillions Corner Bridge, which carries Route 1 over Kingstown Rd./Pt. Judith Rd. | Bridge Improvement | $10,534,515 | |
RHODE ISLAND | Continued long-term preventative maintenance on the Jamestown-Verrazzano Bridge, which carries Route 138 over the West Passage of Narragansett Bay. | Bridge Improvement | $3,379,512 | |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | Rehabilitation of Industrial Dr., including sidewalk repairs and resurfacing, which carries Industrial Dr. over the Moshassuck River. | Bridge Improvement | $3,433,108 |
RHODE ISLAND | I-95 Resurfacing from the CT State Line to Exit 3, Richmond & Hopkinton (Engineer: Preiss) STIMULUS FUNDING | Pavement Improvement | $12,551,712 | |
RHODE ISLAND | Removal and replacement of light poles and electrical systems for overhead lighting on I-295 at Exits 1, 2, 4 and 5 from Warwick to Johnston. Contract includes additional traffic cameras for the TMC. | Safety/Traffic Management | $3,865,243 | |
RHODE ISLAND | Application of striping on State roadways in Burrillville, Central Falls, Cumberland, Glocester, Lincoln, North Providence, North Smithfield, Pawtucket, Smithfield and Woonsocket. | Safety/Traffic Management | $1,811,221 | |
RHODE ISLAND | Application of striping on State roadways in Barrington, Bristol, East Providence, Little Compton, Middletown, Newport, Portsmouth, Providence, Tiverton and Warren. | Safety/Traffic Management | $1,695,756 | |
RHODE ISLAND | Manton Avenue Streetscape Project, Providence, (Engineer: Queenan) STIMULUS FUNDING | Safety/Traffic Management | $175,548 | |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | Statewide maintenance contract which involves signal repair and minor resurfacing as needed at roughly 60 different intersections. | Safety/Traffic Management | $1,105,763 |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | Various traffic signal improvements including new installations, signal modifications, and island modifications in Barrington, Burrillville, Foster, Johnston, North Providence, North Smithfield, Pawtu | Safety/Traffic Management | $926,116 |
RHODE ISLAND | Replacement and repair of rusted, damaged and/or substandard guardrail. | Safety/Traffic Management | $1,199,796 | |
RHODE ISLAND | Installation of new sidewalks and curbing on Bristol Ferry Road from West Main Road/Route 114 to Boyd's Lane. Includes Intersection improvements and new traffic signals with pedestrian signals. | Pavement Improvement | $1,919,374 | |
RHODE ISLAND | Installation of new sidewalks and curbing on Legion Way from Main St. to Providence St. and Providence St. from Legion Way to East Main St./Route 115. (1 miles). | Pavement Improvement | $1,081,627 | |
RHODE ISLAND | Installation of new sidewalks and curbing on Child St. from Cutler St. to Massachusetts State line. (2.2 miles). | Pavement Improvement | $2,891,304 | |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | ADA Downtown Providence Streets, Washington, Weybosset and Westminster Streets - Contract 2 (Engineer: Wilson) STIMULUS FUNDING | Transportation Enhancements | $1,328,268 |
RHODE ISLAND | Involved various drainage improvements in the following communities: Hopkinton (Mechanic St.), Johnston (Winsor Ave. at Hawkins Pond), North Smithfield (Greenville Rd.), and West Greenwich (Escoheag H | Pavement Improvement | $568,032 | |
RHODE ISLAND | Drainage work at the intersection of Ten Rod Road/Rte 165 and Black Plain Rd in Exeter. | Pavement Improvement | $273,699 | |
RHODE ISLAND | Involves various drainage improvements in the following communities: Cranston (Pippin Orchard Rd.), Lincoln (River Rd./Rte. 126), and Narragansett (Bridgetown Rd.). | Pavement Improvement | $376,189 | |
RHODE ISLAND | Powerwashing of 65 of Rhode Island's 772 bridges to remove road salts, dirt and bird droppings. Includes: Cumberland, East Providence, Lincoln, North Smithfield, Pawtucket, Portsmouth, Providence, and | Bridge Improvement | $1,391,635 | |
RHODE ISLAND | Powerwashing of 65 of Rhode Island's 772 bridges to remove road salts, dirt and bird droppings. Includes: Burrillville, Charlestown, Cranston, East Greenwich, Exeter, Hopkinton, Johnston, Narragansett | Bridge Improvement | $461,518 | |
RHODE ISLAND | Construction of a 400-foot rocky seawall along the shoreline of the Seekonk River, salt marsh mitigation, installation of a stone dust river walk and landscaping on the adjacent Warren Avenue project | Other | $425,170 | |
RHODE ISLAND | Resurfacing of Putnam Pike/Route 44, including drainage improvements and guardrail replacement, from Tourtellote Hill Rd. to RIDOT Maintenance Facility (2 miles). | Pavement Improvement | $1,324,324 | |
RHODE ISLAND | Resurfacing of Putnam Pike/Route 44, including replacement of sidewalks, curbing, drainage improvements, and new signal, from Austin Ave. to West Greenville Rd. (1.3 miles). | Pavement Improvement | $2,949,900 | |
RHODE ISLAND | Resurfacing of Main Rd./Route 138, including curbing, sidewalks, and drainage and guardrail improvements, from John Street to the Massachusetts State Line (2.3 miles) | Pavement Improvement | $2,840,558 | |
RHODE ISLAND | Resurfacing of Old Louisquisset Pike/Route 246 from Breakneck Hill Rd./Route 123 to Route 116/Route 146 interchange (2.3 miles). | Pavement Improvement | $1,686,602 | |
RHODE ISLAND | Resurfacing of West Main Road from Coddington Highway to John Kesson Lane. Includes removal of existing concrete median markers; curbing and sidewalk replacement; new signage and pavement markings; re | Pavement Improvement | $6,048,527 | |
RHODE ISLAND | Application of rubberized chip seal. | Pavement Improvement | $2,504,018 | |
RHODE ISLAND | Cleaning and sealing cracks and open joints in the existing bituminous concrete pavement with a hot applied rubberized asphalt sealant. | Pavement Improvement | $299,834 | |
RHODE ISLAND | Cleaning and sealing cracks and open joints in the existing bituminous concrete pavement with a hot applied rubberized asphalt sealant. | Pavement Improvement | $299,834 | |
RHODE ISLAND | Resurfacing of Kingstown Rd./Route 138 from Beaver River Rd. to 660 feet west of Route 112 (2 miles). | Pavement Improvement | $3,015,646 | |
RHODE ISLAND | Resurfacing of two sections of Ocean Rd. in from Narragansett Town Beach to Point Judith, Narragansett (3.7 miles), and Shore Road from Post Road to Ocean View Highway in Westerly (4.5 miles). | Pavement Improvement | $3,003,428 | |
RHODE ISLAND | Chip seal overlay of Hartford Pike/Route 101 from the Connecticut State line to Route 94 in Foster and Anan Wade Rd. to Route 102 in Scituate (4 miles). | Pavement Improvement | $1,721,910 | |
RHODE ISLAND | Resurfacing of Nate Whipple Highway/Route 120, including curbing, sidewalk, guardrail, minor drainage work, and signal work from Diamond Hill Road/Route 114 to Mendon Road/Route 122 (2.6 miles). | Pavement Improvement | $2,791,050 | |
RHODE ISLAND | Resurfacing of Nate Whipple Highway/Route 120, including curbing, sidewalk, guardrail, minor drainage work, and signal work from Diamond Hill Road/Route 114 to the Massachusetts State line (1.7 miles) | Pavement Improvement | $2,225,038 | |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | Reconstruction of Hartford Ave./Route 6A, including curbing, sidewalks, widening a portion to provide a center turn lane, a new drainage system, upgrading traffic signal systems, and installation of f | Pavement Improvement | $4,842,266 |
RHODE ISLAND | PROVIDENCE-PAWTUCKET-WARWICK (MA) | Resurfacing of Dean St., Cahir St. and Stewart St., including upgraded signals and new street lights, from West Exchange St. to Point St. (0.9 miles) | Pavement Improvement | $5,163,234 |
RHODE ISLAND | Resurfacing of Oak St./Westerly Bradford R./Route 91, including sidewalks, minor drainage improvements, water line installation and new signage, from Route 3 to Westerly Maintenance Facility (1.3 mile | Pavement Improvement | $3,935,676 | |
RHODE ISLAND | Construction of stormwater treatment pond at interchange of Route 6 and Killingly St./Route 128. | Other | $917,944 | |
RHODE ISLAND | Project to review approximately 60 out of 130 storm water drainage systems, ponds, catch basins, etc. that were previously upgraded to meet Federal Best Management Practices, in accordance with State | Other | $197,832 | |
RHODE ISLAND | Replacement of signage on I-95 at Exits 6-8 (West Greenwich, East Greenwich, West Warwick, and Warwick), Exit 12B (Warwick), Exists 16-18 (Cranston and Providence), and Exit 29 (Pawtucket). Contract a | Safety/Traffic Management | $3,001,224 | |
RHODE ISLAND | Replacement of all signage on Route 37 from Post Rd./Route 1 in Warwick to Natick Ave. in Cranston (3.2 miles). | Safety/Traffic Management | $3,315,933 | |
RHODE ISLAND | Manton Ave. Streetscape from Delaine St. to Sisson St. (0.8 miles), which includes sidewalks, crosswalks, street trees and street lighting. Other funds (Federal and City) will be used to upgrade signa | Transportation Enhancements | $500,000 | |
RHODE ISLAND | Westminster St. Streetscape from I-95 Service Road No. 7 to Olneyville Square/Manton Ave./Plainfield St. (1.3 miles), which includes sidewalks, crosswalks, bicycle lanes, street trees and street light | Transportation Enhancements | $3,300,000 | |
RHODE ISLAND | Installation of radar-based vehicle detectors, at same location as existing traffic cameras, to collect data on traffic volume, speeds. The new detectors provide alerts to TMC operators to announce i | Safety/Traffic Management | $505,203 | |
RHODE ISLAND | Installation of radar-based vehicle detectors in several locations to collect data on traffic volume, speed, and vehicle classification used for annual reporting requirements and TMC traffic flow maps | Safety/Traffic Management | $913,832 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $3,069,286 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,343,091 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $3,389,930 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $4,479,716 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $8,228,104 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,914,025 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,366,589 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,501,221 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $3,273,380 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $6,117,335 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $5,562,118 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $5,497,875 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,413,294 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,487,281 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $4,636,930 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,302,843 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,300,878 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,592,521 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,629,551 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,813,682 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,905,154 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $3,662,323 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,293,706 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,704,836 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,928,204 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,729,762 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,729,264 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $4,556,505 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $4,957,777 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,549,145 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,138,817 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,106,664 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,141,348 | |
SOUTH CAROLINA | ARRA RESURFACING IN COLLETON AND DORCHESTER COUNTIES | Pavement Improvement | $2,536,659 | |
SOUTH CAROLINA | Bridge, over flow bridges, and approach work Bridge and approach work | Bridge Replacement | $21,000,000 | |
SOUTH CAROLINA | Bridge and approach work | Bridge Replacement | $1,507,950 | |
SOUTH CAROLINA | Overflow bridge and approach work | Bridge Replacement | $2,263,160 | |
SOUTH CAROLINA | CHARLESTON | Bridge and approach work | Bridge Replacement | $521,042 |
SOUTH CAROLINA | Bridge and approach work | Bridge Replacement | $1,011,969 | |
SOUTH CAROLINA | Bridge and approach work | Bridge Replacement | $1,596,646 | |
SOUTH CAROLINA | Sidewalk improvements | Transportation Enhancements | $314,672 | |
SOUTH CAROLINA | Sidewalk Improvements | Transportation Enhancements | $304,003 | |
SOUTH CAROLINA | Pavement and Rehabilitation | Pavement Improvement | $10,540,556 | |
SOUTH CAROLINA | Pavement and Rehabilitation | Pavement Improvement | $11,868,849 | |
SOUTH CAROLINA | COLUMBIA | Pavement and Rehabilitation | Pavement Improvement | $2,745,808 |
SOUTH CAROLINA | Pavement and Rehabilitation | Pavement Improvement | $4,542,027 | |
SOUTH CAROLINA | CHARLESTON | Pavement and Rehabilitation | Pavement Improvement | $11,521,907 |
SOUTH CAROLINA | Pavement and rehabilitation | Pavement Improvement | $4,736,142 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $1,808,163 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $2,532,988 | |
SOUTH CAROLINA | Pavement Reconstruction/Rehab | Pavement Improvement | $5,214,133 | |
SOUTH CAROLINA | ANDERSON | New Location | New Construction | $7,650,000 |
SOUTH CAROLINA | Widening | Pavement Widening | $7,000,000 | |
SOUTH CAROLINA | Intersection Improvement | Pavement Improvement | $1,073,222 | |
SOUTH CAROLINA | Intersection Improvement | Pavement Improvement | $204,307 | |
SOUTH CAROLINA | Intersection Improvement | Pavement Improvement | $674,572 | |
SOUTH CAROLINA | 32.9 miles of markings | Safety/Traffic Management | $641,424 | |
SOUTH CAROLINA | 17.4 miles of markings | Safety/Traffic Management | $341,189 | |
SOUTH CAROLINA | 14.1 miles of markings | Safety/Traffic Management | $267,323 | |
SOUTH CAROLINA | 12 miles of markings | Safety/Traffic Management | $341,576 | |
SOUTH CAROLINA | 4 miles of markings | Safety/Traffic Management | $297,500 | |
SOUTH CAROLINA | 7 miles of markings | Safety/Traffic Management | $244,560 | |
SOUTH CAROLINA | 14 miles of markings | Safety/Traffic Management | $559,818 | |
SOUTH CAROLINA | 6 miles of markings | Safety/Traffic Management | $170,718 | |
SOUTH CAROLINA | 22 miles of markings | Safety/Traffic Management | $332,035 | |
SOUTH CAROLINA | 21 miles of markings | Safety/Traffic Management | $385,297 | |
SOUTH CAROLINA | 7 miles of markings | Safety/Traffic Management | $213,297 | |
SOUTH CAROLINA | 10 miles of markings | Safety/Traffic Management | $166,767 | |
SOUTH CAROLINA | I-26, I-77 Lexington | Safety/Traffic Management | $652,006 | |
SOUTH CAROLINA | COLUMBIA | S-73 @ S-647 | Safety/Traffic Management | $696,732 |
SOUTH CAROLINA | US 15 @ S-10 | Safety/Traffic Management | $1,364,511 | |
SOUTH CAROLINA | S-219 @ S-281 & S-333 | Pavement Improvement | $411,913 | |
SOUTH CAROLINA | SC 105 | Safety/Traffic Management | $1,264,310 | |
SOUTH CAROLINA | US 21 | Safety/Traffic Management | $198,367 | |
SOUTH CAROLINA | Signal Upgrade | Safety/Traffic Management | $1,555,356 | |
SOUTH CAROLINA | ARRA LED SIGNAL HEADS UPGRADES IN DISTRICT 2 /SIGNAL UPGRADES | Safety/Traffic Management | $1,024,357 | |
SOUTH CAROLINA | Signal Upgrade | Safety/Traffic Management | $709,807 | |
SOUTH CAROLINA | I-526 Charleston | Safety/Traffic Management | $618,961 | |
SOUTH DAKOTA | Pavement Grinding & Epoxy Paint | Pavement Improvement | $1,571,611 | |
SOUTH DAKOTA | RAPID CITY | Mill & AC Overlay | Pavement Improvement | $3,788,434 |
SOUTH DAKOTA | AC Overlay | Pavement Improvement | $6,043,915 | |
SOUTH DAKOTA | Asphalt Conc Surfacing | Pavement Improvement | $4,302,829 | |
SOUTH DAKOTA | Mill & AC Overlay | Pavement Improvement | $2,546,826 | |
SOUTH DAKOTA | Mill & AC Overlay | Pavement Improvement | $161,985 | |
SOUTH DAKOTA | Asphalt Concrete Surfacing | Pavement Improvement | $1,303,170 | |
SOUTH DAKOTA | Mill & AC Overlay | Pavement Improvement | $3,174,933 | |
SOUTH DAKOTA | Mill & AC Overlay | Pavement Improvement | $2,326,123 | |
SOUTH DAKOTA | Dowel Bar Retrofit, & Pavement Restoration | Pavement Improvement | $1,673,349 | |
SOUTH DAKOTA | Remove & Replace With Jointed Conc Pavement | Pavement Improvement | $8,331,478 | |
SOUTH DAKOTA | SBL, Remove & Replace PCCP Pavement | Pavement Improvement | $14,752,119 | |
SOUTH DAKOTA | Shoulder Rehabilitation & Edge Drains; Milling & Asphalt Concrete Resurfacing; Construct Crossovers for Future Project, Misc; | Pavement Improvement | $13,791,193 | |
SOUTH DAKOTA | Remove & Replace PCCP | Pavement Improvement | $23,279,966 | |
SOUTH DAKOTA | AC Overlay | Pavement Improvement | $1,514,881 | |
SOUTH DAKOTA | Mill & AC Overlay | Pavement Improvement | $1,727,994 | |
TENNESSEE | MEMPHIS (AR-MS) | FROM ISABELLE STREET TO WHITE STATION ROAD | Pavement Improvement | $1,132,123 |
TENNESSEE | FROM CENTERTOWN TO SPRING VALLEY ROAD | New Construction | $8,951,029 | |
TENNESSEE | FROM WARREN COUNTY LINE TO WHITE COUNTY LINE | Pavement Improvement | $321,330 | |
TENNESSEE | FROM VICTOR J. YOUNG ROAD TO VAN BUREN COUNTY LINE | Pavement Improvement | $149,908 | |
TENNESSEE | FROM VAN BUREN COUNTY LINE TO COLE ROAD | Pavement Improvement | $216,950 | |
TENNESSEE | FROM TIPTON COUNTY LINE TO OVERFLOW BRIDGE | Pavement Improvement | $883,296 | |
TENNESSEE | KNOXVILLE | FROM WEST OF SR-73 TO WEST OF SR-1 | Pavement Improvement | $909,796 |
TENNESSEE | MURFREESBORO | FROM NORTH OF RUTHERFORD BOULEVARD TO EPPS MILL ROAD | Pavement Improvement | $1,097,355 |
TENNESSEE | CLEVELAND | FROM CLEVELAND CITY LIMITS TO SR-40 | Pavement Improvement | $735,118 |
Source: FDIC