Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
ARKANSAS | ACHM REHABILITATION OF 2.45 MILES | Pavement Improvement | $565,559 | |
ARKANSAS | ACHM REHABILITATION OF 9.63 MILES | Pavement Improvement | $2,143,172 | |
ARKANSAS | ACHM REHABILITATION OF 5.39 MILES | Pavement Improvement | $1,192,191 | |
ARKANSAS | ACHM REHABILITATION OF 3.75 MILES | Pavement Improvement | $936,355 | |
ARKANSAS | ACHM REHABILITATION OF 6.09 MILES | Pavement Improvement | $1,427,080 | |
ARKANSAS | ACHM REHABILITATION OF 3.11 MILES | Pavement Improvement | $706,940 | |
ARKANSAS | ACHM REHABILITATION OF 3.06 MILES | Pavement Improvement | $1,063,483 | |
ARKANSAS | ACHM REHABILITATION OF 3.44 MILES | Pavement Improvement | $1,146,370 | |
ARKANSAS | ACHM REHABILITATION OF 1.67 MILES | Pavement Improvement | $358,266 | |
ARKANSAS | ACHM REHABILITATION OF 3.41 MILES | Pavement Improvement | $988,772 | |
ARKANSAS | ACHM REHABILITATION OF 1.01 MILES | Pavement Improvement | $382,750 | |
ARKANSAS | ACHM REHABILITATION OF 1.24 MILES | Pavement Improvement | $589,575 | |
ARKANSAS | ACHM REHABILITATION OF 5.45 MILES | Pavement Improvement | $951,308 | |
ARKANSAS | ACHM REHABILITATION OF 1.78 MILES | Pavement Improvement | $551,922 | |
ARKANSAS | ACHM REHABILITATION OF 3.09 MILES | Pavement Improvement | $712,941 | |
ARKANSAS | ACHM REHABILITATION OF 2.77 MILES | Pavement Improvement | $699,975 | |
ARKANSAS | ACHM REHABILITATION OF 3.47 MILES | Pavement Improvement | $790,646 | |
ARKANSAS | ACHM REHABILITATION OF 2.74 MILES | Pavement Improvement | $1,095,726 | |
ARKANSAS | ACHM REHABILITATION OF 1.65 MILES | Pavement Improvement | $566,625 | |
ARKANSAS | ACHM REHABILITATION OF 2.00 MILES | Pavement Improvement | $501,865 | |
ARKANSAS | ACHM REHABILITATION OF 3.67 MILES | Pavement Improvement | $1,097,682 | |
ARKANSAS | ACHM REHABILITATION OF 1.57 MILES | Pavement Improvement | $456,279 | |
ARKANSAS | ACHM REHABILITATION OF 2.83 MILES | Pavement Improvement | $849,864 | |
ARKANSAS | ACHM REHABILITATION OF 2.14 MILES | Pavement Improvement | $856,050 | |
ARKANSAS | ACHM REHABILITATION OF 2.66 MILES | Pavement Improvement | $596,327 | |
ARKANSAS | ACHM REHABILITATION OF 1.40 MILES | Pavement Improvement | $223,771 | |
ARKANSAS | CONCRETE PAVEMENT PATCHING OF 1.10 MILES | Pavement Improvement | $1,063,779 | |
ARKANSAS | ACHM REHABILITATION OF 2.80 MILES | Pavement Improvement | $503,782 | |
ARKANSAS | ACHM REHABILITATION OF 1.20 MILES | Pavement Improvement | $248,711 | |
ARKANSAS | ACHM REHABILITATION OF 5.40 MILES | Pavement Improvement | $944,337 | |
ARKANSAS | ACHM REHABILITATION OF 3.25 MILES | Pavement Improvement | $1,146,294 | |
ARKANSAS | ACHM REHABILITATION OF 2.60 MILES | Pavement Improvement | $1,077,056 | |
ARKANSAS | ACHM REHABILITATION OF 3.61 MILES | Pavement Improvement | $1,046,126 | |
ARKANSAS | ACHM REHABILITATION OF 9.50 MILES | Pavement Improvement | $1,313,405 | |
ARKANSAS | ACHM REHABILITATION OF 4.12 MILES | Pavement Improvement | $997,244 | |
ARKANSAS | ACHM REHABILITATION OF 5.05 MILES | Pavement Improvement | $1,342,263 | |
ARKANSAS | ACHM REHABILITATION OF 2.68 MILES | Pavement Improvement | $758,692 | |
ARKANSAS | ACHM REHABILITATION OF 5.90 MILES | Pavement Improvement | $908,318 | |
ARKANSAS | ACHM REHABILITATION OF 1.64 MILES | Pavement Improvement | $454,818 | |
ARKANSAS | ACHM REHABILITATION OF 0.37 MILES | Pavement Improvement | $191,256 | |
ARKANSAS | ACHM REHABILITATION OF 5.18 MILES | Pavement Improvement | $2,205,512 | |
ARKANSAS | ACHM REHABILITATION OF 7.40 MILES | Pavement Improvement | $2,795,051 | |
ARKANSAS | ACHM REHABILITATION OF 1.79 MILES | Pavement Improvement | $734,735 | |
ARKANSAS | ACHM REHABILITATION OF 0.84 MILES | Pavement Improvement | $337,833 | |
ARKANSAS | ACHM REHABILITATION OF 4.10 MILES | Pavement Improvement | $1,080,848 | |
ARKANSAS | ACHM REHABILITATION OF 1.10 MILES | Pavement Improvement | $435,074 | |
ARKANSAS | ACHM REHABILITATION OF 0.26 MILES | Pavement Improvement | $117,861 | |
ARKANSAS | ACHM REHABILITATION OF 1.05 MILES | Pavement Improvement | $247,859 | |
ARKANSAS | ACHM REHABILITATION OF 2.14 MILES | Pavement Improvement | $658,858 | |
ARKANSAS | CONCRETE PAVEMENT PATCHING OF 3.59 MILES | Pavement Improvement | $934,305 | |
ARKANSAS | WIDEN 0.30 MILE TO 5 LANES WITH CURB AND GUTTER | Pavement Widening | $1,471,518 | |
ARKANSAS | WIDEN 4.1 MILES TO 5 LANES WITH SHOULDERS | Pavement Widening | $10,052,411 | |
ARKANSAS | PROVIDE STRUCTURES FOR A 4-LANE DIVIDED FACILITY ON NEW LOCATION | New Bridge Construction | $11,693,084 | |
ARKANSAS | PROVIDE 2.69 MILES OF GRADING AND STRUCTURES FOR A 4-LANE DIVIDED FACILITY ON NEW LOCATION | New Construction | $13,117,768 | |
ARKANSAS | PROVIDE GRADING AND MINOR DRAINAGE STRUCTURES FOR 2.28 MILES OF A 4-LANE DIVIDED FACILITY ON NEW LOCATION | New Construction | $11,854,042 | |
ARKANSAS | CONSTRUCT AND INSTALL TRAFFIC SIGNAL | Safety/Traffic Management | $83,737 | |
ARKANSAS | SURFACE 1.30 MILES | Pavement Improvement | $159,875 | |
ARKANSAS | RECONSTRUCT 0.84 MILES | Pavement Improvement | $529,105 | |
ARKANSAS | REPLACE BRIDGE | Bridge Replacement | $1,693,838 | |
ARKANSAS | REPLACE BRIDGE | Pavement Improvement | $985,359 | |
ARKANSAS | CONSTRUCT AND INSTALL TRAFFIC SIGNAL | Pavement Improvement | $164,828 | |
ARKANSAS | LITTLE ROCK-NORTH LITTLE ROCK | MAJOR WIDENING OF 0.7 MILES OF BROCKINGTON ROAD (2 LANES TO 4 LANES) | Other | $93,660 |
CALIFORNIA | LOS ANGELES, CA | GRAND AVENUE PAVING PROJECT FROM ARROW HIGHWAY TO FOOTHILL BOULEVARD. GRIND AND PAVE ASPHALT PAVEMENT, CONSTRUCT LOCAL REPAIRS, RECONSTRUCT DAMAGED CURB/GUTTER, SIDEWALK, CROSSGUTTER AND CURB RAMPS. | Pavement Improvement | $1,537,000 |
CALIFORNIA | SACRAMENTO | In Sacramento, El Dorado, Yolo and Placer counties, at various locations. | Safety/Traffic Management | $2,198,800 |
CALIFORNIA | In Tehama and Plumas Counties, as Various Locations. | Pavement Improvement | $3,132,600 | |
CALIFORNIA | In Kern and King Counties near Avenal and Devil's Den (Sunflower Valley) on State Route 41, from the Kern/Kings County line and from Kings County line to Utica Avenue and on State Route 33 from Kings | Pavement Improvement | $3,891,487 | |
CALIFORNIA | LOS ANGELES, CA | In Sun Valley and Sylmar, from Hollywood Way to north of San Fernando Road. | Pavement Improvement | $13,651,950 |
CALIFORNIA | Near Grapevine, at various locations. | Pavement Improvement | $1,651,958 | |
CALIFORNIA | In and near Red Bluff, from 5.3 miles south of Adobe Road Overcrossing to Adobe Road Overcrossing. | Pavement Improvement | $39,733,188 | |
CALIFORNIA | In Riverside County in and near Corona, from Temescal Canyon Road to 0.4 mile south of Ontario Avenue. | Pavement Improvement | $969,450 | |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | In Fairfield, from 0.4 mile west of Route 12 to 0.8 mile east of Airbase Parkway. (FTIP Description: Suisun/Fairfield: From I-80/I680/SR12 (Redtop) to Putah Creek; construct HOV lanes and install Ramp | Pavement Improvement | $19,570,134 |
CALIFORNIA | LOS ANGELES, CA | In Los Angeles County in and near Pasadena, from State Route 2-Angeles Crest Highway Separation to 0.2 mile west of Marengo Avenue Overcrossing. | Pavement Improvement | $573,850 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | In San Jose, from Cypress Avenue Pedestrian Overcrossing to Tantau Avenue. | Pavement Improvement | $15,008,682 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | SAN MATEO COUNTY - RTE 280 PM 0.0 TO 27.4 , INSTALL TRAFFIC MONITORING ELEMENTS | Safety/Traffic Management | $2,495,500 |
CALIFORNIA | LOS ANGELES, CA | Widen NB I-405 for HOV Lane | Safety/Traffic Management | $189,900,000 |
CALIFORNIA | SACRAMENTO | Rehabilitate various roadways in Sacramento | Pavement Improvement | $5,746,013 |
CALIFORNIA | SACRAMENTO | VARIOUS LOCATIONS W/IN THE CITY OF SACRAMENTO , AC OVERLAYS PHASE II | Pavement Improvement | $2,310,610 |
CALIFORNIA | VALLEJO | ROUTE 780 AT STATE PARK RD O.C. , WIDEN OC FOR CLASS 1 BIKE PATH | Transportation Enhancements | $320,000 |
CALIFORNIA | VALLEJO | Rehabilitate local street | Pavement Improvement | $400,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Pavement Improvement | $12,701,000 |
CALIFORNIA | LOS ANGELES, CA | LAX HOSPITALITY ZONE/SEE STATE COMMENTS , RESURFACE STRTS & SIDEWLK IMPROV | Pavement Improvement | $7,000,000 |
CALIFORNIA | LOS ANGELES, CA | COMMERCE AVE PEDESTRIAN IMPROVEMENTS: THIS IS A PILOT PROJECT TO INSTALL 'GREEN' SIDEWALK IMPROVEMENTS USING 100% RECYCLED RUBBER/PLASTIC INTERLOCKING MODULAR PAVING SYSTEM ALONG COMMERCE AVE BETWEEN | Pavement Improvement | $900,000 |
CALIFORNIA | LOS ANGELES, CA | LAUSD VALLEY REGION HS #4 PEDESTRIAN IMPROVEMENTS: THIS PROJECT WILL PROVIDE SIDEWALK IMPROVEMENTS IN THE VICINITY OF LAUSDS NEW SCHOOL AT THE INTERSECTION OF BALBOA BL AND SAN JOSE ST IN THE SAN FERN | Pavement Improvement | $300,000 |
CALIFORNIA | LOS ANGELES, CA | CITY OF LOS ANGELES NORTH CENTRAL REGION RESURFACING PROJECT- PHASE II: THIS PROJECT WILL RESURFACE AND REHABILITATE EXISTING STREET IN THE NORTH CENTRAL REGION OF THE CITY OF LOS ANGELES. THIS IS A N | Pavement Improvement | $7,275,000 |
CALIFORNIA | LOS ANGELES, CA | CITY OF LOS ANGELES WEST VALLEY REGION RESURFACING PROJECT - PHASE II: THIS PROJECT WILL RESURFACE AND REHABILITATE EXISTING STREETS IN THE WEST SAN FERNANDO VALLEY REGION OF THE CITY. THIS IS A NON-C | Pavement Improvement | $7,275,000 |
CALIFORNIA | LOS ANGELES, CA | CITY OF LOS ANGELES EAST VALLEY REGION RESURFACING PROJECTS - PHASE II: THIS PROJECT WILL RESURFACE AND REHABILITATE EXISTING STREETS IN THE EAST SAN FERNANDO VALLEY REGION OF THE CITY. THIS IS A NON- | Pavement Improvement | $7,275,000 |
CALIFORNIA | LOS ANGELES, CA | CITY OF LOS ANGELES BAY HARBOR REGION RESURFACING PROJECTS - PHASE II: THIS PROJECT WILL RESURFACE AND REHABILITATE EXISTING STREETS IN THE BAY HARBOR REGION OF THE CITY. THIS IS A NON-CAPACITY INCREA | Pavement Improvement | $7,275,000 |
CALIFORNIA | LOS ANGELES, CA | CITYWIDE , INSTALLATION OF LEFT TURN ARROWS | Safety/Traffic Management | $4,000,000 |
CALIFORNIA | LOS ANGELES, CA | TRANSIT PRIORITY SYSTEM (TPS) AND ATSAC COMMUNICATION SYSTEM REHABILITATION | Safety/Traffic Management | $6,000,000 |
CALIFORNIA | LOS ANGELES, CA | CITYWIDE , LED TRAFFIC SIGNAL LIGHTS | Safety/Traffic Management | $9,000,000 |
CALIFORNIA | LOS ANGELES, CA | CITYWIDE , NEW TRAFFIC SIGNAL | Safety/Traffic Management | $3,500,000 |
CALIFORNIA | LOS ANGELES, CA | LOS ANGELES HIGHWAY-RAIL GRADE CROSSING SURFACE RECONSTRUCTION PROJECT - THE MAIN OBJECTIVE OF THIS PROJECT IS TO SIGNIFICANTLY IMPROVE HIGHWAY-RAIL GRADE CROSSING SURFACES CITYWIDE. MANY CROSSING SU | Safety/Traffic Management | $7,932,000 |
CALIFORNIA | LOS ANGELES, CA | THE PROJECT IS TO UPGRADE ROADWAYS GRATES NEAR OR ALONG BIKE PATHS, BIKE LANES AND BIKE ROUTES, AS WELL AS NEAR LIGHT RAIL STATIONS AND TRANSIT HUBS TO IMPROVE BICYCLE ACCESS SAFETY AND PROMOTE CYCLIN | Transportation Enhancements | $748,746 |
CALIFORNIA | LOS ANGELES, CA | THE PROJECT IS TO UPGRADE ROADWAYS GRATES NEAR OR ALONG BIKE PATHS, BIKE LANES AND BIKE ROUTES, AS WELL AS NEAR LIGHT RAIL STATIONS AND TRANSIT HUBS TO IMPROVE BICYCLE ACCESS SAFETY AND PROMOTE CYCLIN | Safety/Traffic Management | $3,000,000 |
CALIFORNIA | LOS ANGELES, CA | CITYWIDE , HIGHWAY-RAIL SAFETY | Safety/Traffic Management | $2,368,000 |
CALIFORNIA | LOS ANGELES, CA | VARIOUS STRTS IN CITY OF LA , RESURFACE STRTS | Pavement Improvement | $15,588,000 |
CALIFORNIA | LOS ANGELES, CA | HARRY S BRIDGES BLVD RELOCATION/CONSOLIDATION OF STREETS, STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND SIGNALIZATION (TEA21-#978) | Pavement Improvement | $21,472,000 |
CALIFORNIA | STOCKTON | 24 ROADS IN THE THE CITY OF STOCKTON * , AC OVERLAY | Pavement Improvement | $6,141,391 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Pedestrian Enhancements | Transportation Enhancements | $1,194,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $4,774,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,304,000 |
CALIFORNIA | SACRAMENTO | CARSON RD AND COLD SPRINGS RD ; SEE SCOMMENTS , REHABILITATION | Pavement Improvement | $650,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Pavement Improvement | $962,000 |
CALIFORNIA | SAN JOSE, CA | Install technology improvements | Safety/Traffic Management | $553,000 |
CALIFORNIA | SANTA ROSA | Rehabilitate local street | Pavement Improvement | $1,109,000 |
CALIFORNIA | CONCORD | VARIOUS STREETS IN CITY OF MARTINEZ , SLURRY SEAL | Pavement Improvement | $850,000 |
CALIFORNIA | SANTA CRUZ | Road repairs: Morrissey Blvd from Soquel Ave to Fairmount | Pavement Improvement | $451,000 |
CALIFORNIA | SANTA CRUZ | Road repairs: Market St from Water to SR1 | Pavement Improvement | $343,000 |
CALIFORNIA | SANTA CRUZ | Road repairs: West Cliff Dr from Almar Blvd to Bay St | Pavement Improvement | $556,000 |
CALIFORNIA | OXNARD-VENTURA | Steet Rehab. Olive Street Phase I | Pavement Improvement | $530,943 |
CALIFORNIA | OXNARD-VENTURA | Traffic Signal at intersection of Kimball & Foothill Rd. | Other | $400,000 |
CALIFORNIA | SANTA ROSA | Rehabilitate local street | Pavement Improvement | $500,000 |
CALIFORNIA | SANTA ROSA | Rehabilitate local street | Pavement Improvement | $3,696,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $736,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | SR82 FROM BROADWAY TO BREWSTER , RECONSRTC ROAD, SIDEWALK. LIGHT | Pavement Improvement | $523,000 |
CALIFORNIA | VALLEJO | Pedestrian Enhancements | Transportation Enhancements | $2,138,000 |
CALIFORNIA | VALLEJO | Rehabilitate local street | Pavement Improvement | $1,020,000 |
CALIFORNIA | SANTA CRUZ | Road repairs: various roadways | Pavement Improvement | $1,200,000 |
CALIFORNIA | FAIRFIELD | Rehabilitate local street | Pavement Improvement | $700,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Transportation Enhancements | $663,000 |
CALIFORNIA | CHICO | Reconstruct Interchange, improve operations | Pavement Widening | $5,500,000 |
CALIFORNIA | ANTIOCH-PITTSBURGH | Rehabilitate local street | Pavement Improvement | $1,605,000 |
CALIFORNIA | Rehabilitate local street | Pavement Improvement | $500,000 | |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,338,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,600,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,188,000 |
CALIFORNIA | VISALIA | BEN MADDOX WAY OVERCROSSING , BRIDGE UPGRADES AND IMPROVEMENTS | Bridge Improvement | $6,400,000 |
CALIFORNIA | SEASIDE-MONTEREY | Reconstruct between Natividad and North Sanborn Roads | Pavement Improvement | $2,956,000 |
CALIFORNIA | CR 102, from East Beamer St to Hanson Wy: Rehabilitate roadway. | Pavement Improvement | $655,725 | |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $2,037,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,479,000 |
CALIFORNIA | LOS ANGELES, CA | Street pavement rehabilitation / reconstruction, including curb ramps, utility adjustments and re-striping and traffic loop replacement | Pavement Improvement | $1,100,000 |
CALIFORNIA | LOS ANGELES, CA | Street pavement rehabilitation / reconstruction, including curb ramps, utility adjustments and re-striping and traffic loop replacement | Pavement Improvement | $1,000,000 |
CALIFORNIA | LOS ANGELES, CA | BROADWAY FROM EAST STREET TO BOND STREET , PAVEMENT REHABILITATION | Pavement Improvement | $650,000 |
CALIFORNIA | Rehabilitate local street | Pavement Improvement | $300,000 | |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,619,000 |
CALIFORNIA | SAN BERNARDINO-RIVERSIDE | Install median landscaping | Transportation Enhancements | $348,000 |
CALIFORNIA | LOS ANGELES, CA | RESURFACING VARIOUS STREETS WITHIN THE CITY OF PASADENA ON THE SELECT STREET SYSTEM WITH RUBBERIZED ASPHALT.ÊÊ | Pavement Improvement | $4,331,000 |
CALIFORNIA | SAN JOSE, CA | Intersection improvements and signal upgrade | Safety/Traffic Management | $529,000 |
CALIFORNIA | LOMPOC | Street pavement rehabilitation and overlays on V Street, College Avenue, 7th Street, O Street, and North Avenue in Lompoc. | Pavement Improvement | $682,161 |
CALIFORNIA | SEASIDE-MONTEREY | Reconstruct between Fremont and Elorado | Pavement Improvement | $601,000 |
CALIFORNIA | HANFORD | ON HANFORD-ARMONA RD, FROM 11TH TO GREENBRIAR , REHABILITATE ROADWAY & AC OVERLAY | Pavement Improvement | $825,000 |
CALIFORNIA | LOS ANGELES, CA | PRIORITY 1 INGLEWOOD AVE STREET RESURFACING FROM ARTESIA BLVD TO MANHATTAN BEACH BLVD, INCLUDES STREET RECONSTRUCTION, GRINDING, PAVING, CURB & GUTTER, STRIPING AND DETECTION LOOP INSTALLATION | Pavement Improvement | $1,531,000 |
CALIFORNIA | LOS ANGELES, CA | PRIORITY 2 PROSPECT AVENUE STREET RESURFACING FROM PALOS VERDES BLVD TO ANITA ST/190TH STREET, INCLUDES STREET RECONSTRUCTION, GRINDING, PAVING, CURB & GUTTER, STRIPING AND DETECTION LOOP INSTALLATION | Pavement Improvement | $447,000 |
CALIFORNIA | VACAVILLE | Pedestrian Enhancements | Safety/Traffic Management | $260,000 |
CALIFORNIA | VACAVILLE | Rehabilitate local street | Pavement Improvement | $1,376,000 |
CALIFORNIA | VACAVILLE | Install technology improvements | Safety/Traffic Management | $320,000 |
CALIFORNIA | SACRAMENTO | SUNSET BLVD FROM BLUE OAKS TO ATHERTON RD , REHABILITATION | Pavement Improvement | $1,289,206 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Pavement Improvement | $580,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Pavement Improvement | $505,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,588,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,545,000 |
CALIFORNIA | LOS ANGELES, CA | SANTA MONICA BLVD RESURFACING PROJECT PHASE II - MAINTENANCE AND REPAIR TO THE EXISTING ASPHALT STREET AND CONCRETE CURBS, GUTTERS AND SIDEWALKS ON SANTA MONICA BLVD FROM CLOVERFIELD BOULEVARD TO CENT | Pavement Improvement | $882,288 |
CALIFORNIA | LOS ANGELES, CA | STREET RESURFACING CITYWIDE- PAVING ON COLLECTOR AND ARTERIAL STREETS INCLUDING MAINTENANCE AND REPAIR TO THE EXISTING ASPHALT STREET AND CONCRETE CURBS, GUTTERS AND SIDEWALKS. THE SCOPE OF MAINTENAN | Pavement Improvement | $1,794,533 |
CALIFORNIA | LOS ANGELES, CA | SPRING ST: CLARK AVE TO EAST CITY LIMITS . , ROAD REHABILITATION . | Pavement Improvement | $10,832,921 |
CALIFORNIA | LOS ANGELES, CA | HARDING ST: DEFOREST AVE TO ATLANTIC AVE . , ASPHALT CONCRETE OVERLAY . | Pavement Improvement | $426,213 |
CALIFORNIA | LOS ANGELES, CA | CALIFORNIA AVE: HARDING ST TO ARTESIA BLVD . , PAVEMENT REHABILITATION . | Pavement Improvement | $1,472,465 |
CALIFORNIA | LOS ANGELES, CA | CARSON ST: LONG BEACH BLVD/ATLANTIC AVE , ASPHALT CONCRETE OVERLAY | Pavement Improvement | $1,651,401 |
CALIFORNIA | LOS ANGELES, CA | CUSTOM BICYCLE RACKS AND PROTECTED BICYCLE PARKING FOR INSTALLATION THROUGHOUT THE CITY, INCLUDING PARKS, LIBRARIES, SCHOOLS. NO ENVIRONMENTAL CLEARANCE IS REQUIRED. PROCUREMENT PROCESS WILL INCLUDE | Transportation Enhancements | $749,000 |
CALIFORNIA | BAKERSFIELD | Hughes Lane: White Lane to Planz Rd; Wible Road: White Lane to Pacheco Road; Wilson Road: White Lane to Planz Road; Resurfacing, Reconstruction | Other | $2,432,000 |
CALIFORNIA | BAKERSFIELD | Mt. Vernon Ave: State Route 178 to University Ave; Resurfacing, Reconstruction | Other | $1,772,000 |
CALIFORNIA | BAKERSFIELD | Ashe Rd: White Lane to Ming Ave; Resurfacing, Reconstruction | Other | $1,850,000 |
CALIFORNIA | Grant Ave.(SR128), east of Railroad Ave., between Dutton St and Morgan St.: widen to accommodate a continuous left turn lane to improve safety. | Pavement Improvement | $400,000 | |
CALIFORNIA | LOS ANGELES, CA | FOOTHILL BLVD FROM TODD AVE. TO ORANGE AVE.. , REHABILITAION OF ROADWAY | Pavement Improvement | $1,431,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $335,000 |
CALIFORNIA | SANTA ROSA | Rehabilitate local street | Pavement Improvement | $500,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $671,000 |
CALIFORNIA | LOS ANGELES, CA | VARIOUS; CITY OF COVINA; CITYWIDE . , STREET OVERLAY . | Pavement Improvement | $1,455,000 |
CALIFORNIA | OXNARD-VENTURA | 8th Street from Harvard to Santa Paula Street | Pavement Improvement | $254,000 |
CALIFORNIA | SANTA ROSA | Rehabilitate local street | Pavement Improvement | $500,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Pavement Improvement | $851,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Pedestrian Enhancements | Pavement Improvement | $214,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | APPIAN WAY FROM SAN PABLO TO TARA HILLS , AC OVERLAY | Pavement Improvement | $420,000 |
CALIFORNIA | ANTIOCH-PITTSBURGH | Rehabilitate local street | Pavement Improvement | $1,103,000 |
CALIFORNIA | OXNARD-VENTURA | Bartolo Square North Street Resurfacing | Pavement Improvement | $1,091,462 |
CALIFORNIA | OXNARD-VENTURA | Traffic Signal Improvements, various locations | Safety/Traffic Management | $740,000 |
CALIFORNIA | OXNARD-VENTURA | Bartolo Square South Street Resurf. | Pavement Improvement | $1,444,000 |
CALIFORNIA | LOS ANGELES, CA | REHABILITATE NEW AVENUE FROM LOS HIGOS/NORTH BOUNDARY TO I-10 FWY. | Pavement Improvement | $1,612,939 |
CALIFORNIA | LOS ANGELES, CA | REHABILITATE ALHAMBRA ROAD FROM CITY BOUNDARY EAST TO CITY BOUNDARY WEST. | Pavement Improvement | $249,091 |
CALIFORNIA | LOS ANGELES, CA | SANTA ANITA AVE: GRAND VIEW AVE - FOOTHILL BL , AC OVERLAY, CURB & GUTTER, SIDEWALK | Pavement Improvement | $757,000 |
CALIFORNIA | LOS ANGELES, CA | SANTA ANITA AVENUE BETWEEN LONGDEN AVENUE AND LIVE OAK AVENUE: STREET REHABILITATION INCLUDING GRINDING THE ENTIRE STREET AND OVERLAYING WITH NEW ASPHALT, FULL-DEPTH ASPHALT PATCHING, NEW CONCRETE CUR | Pavement Improvement | $600,000 |
CALIFORNIA | FAIRFIELD | Rehabilitate local street | Pavement Improvement | $900,000 |
CALIFORNIA | FAIRFIELD | Rehabilitate local street | Pavement Improvement | $900,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,270,000 |
CALIFORNIA | CONCORD | Rehabilitate local street | Pavement Improvement | $584,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street and add bicycle lane | Pavement Improvement | $1,578,000 |
CALIFORNIA | 26TH STREET IMPROVEMENT FROM ALAMEDA TO EAST OF DOWNEY ROAD. REHABILITATION OF PAVEMENT, SIDEWALK, CURB, GUTTER, DRIVE APPROACHES, INTERSECTION IMPROVEMENTS, AND TRAFFIC SIGNAL IMPROVEMENTS | Pavement Improvement | $500,000 | |
CALIFORNIA | Roadway Rehabilitation / Overlays | Pavement Improvement | $1,095,000 | |
CALIFORNIA | LOS ANGELES, CA | MONTEREY ROAD NEW TRAFFIC SIGNALS. CONSTRUCT 3 NEW TRAFFIC SIGNALS AT MONTEREY RD./GENEVA ST., MONTEREY RD./JACKSON ST., MONTEREY RD./LOUISE ST. ALL 3 INTERSECTIONS SATISFY THE CALIFORNIA MUTCD WARRA | Pavement Improvement | $900,000 |
CALIFORNIA | LOS ANGELES, CA | STREET REPAIR AND REHABILITATION PROJECT, PHASE VI: PACIFIC AVE. AND ALLEN STREET-THE PROJECT INCLUDES THE RESURFACING AND SELECTIVE REPAIR OF CURB, GUTTER AND SIDEWALK AREAS ALONG 0.8 MILE OF CITY ST | Pavement Improvement | $1,624,000 |
CALIFORNIA | LOS ANGELES, CA | SOUTHERN PORTION OF CITY OF GLENDALE_ 52 LOC. , CHANGIING SIGNAL CONTROLLER TO 2070 | Pavement Improvement | $529,000 |
CALIFORNIA | LOS ANGELES, CA | CENTRAL/MAPLE,CHEVY CHASE/HARVARD, WILSON/SIN , TRAFFIC SIGNAL INSTALLATION | Pavement Improvement | $900,000 |
CALIFORNIA | LOS ANGELES, CA | STREET REPAIR AND REHABILITATION PROJECT PHASE I: CHEVY CHASE DR. AND CYPRESS ST.-THE PROJECT INCLUDES THE RESURFACING AND SELECTIVE REPAIR OF CURB, GUTTER AND SIDEWALK AREAS ALONG 5 MILES OF CITY STR | Pavement Improvement | $900,000 |
CALIFORNIA | LOS ANGELES, CA | NORTH CITY OF GLENDALELE VARIOUS LOCATIONS , CONTROLLER CONVERSION TO 2070 | Pavement Improvement | $1,200,000 |
CALIFORNIA | LOS ANGELES, CA | COMPLETE REHABILITATION OF 1.3 MILE LENGTH OF GOLDEN HILLS ROAD FROM SAN DIMAS CANYON TO ESPERANZA DRIVE.ÊÊ | Pavement Improvement | $800,000 |
CALIFORNIA | LOS ANGELES, CA | Town Center Drive from Foothill Boulevard to White Avenue. Includes 70 percent of the street to have full depth replacement, some areas of selected removal and replacement, cold planning and asphalt | Pavement Improvement | $202,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Pavement Improvement | $556,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $267,000 |
CALIFORNIA | YUBA CITY | In Yuba City, from Plumas to Shasta, construct signal-phasing modifications, street reconstruction, pedestrian-scale street lighting, sidewalks and new pedestrian crossings as part of the city's downt | Pavement Improvement | $1,900,000 |
CALIFORNIA | Yuba City, Live Oak Blvd. and Garden Highway: Rehabilitate roadways, | Pavement Improvement | $753,627 | |
CALIFORNIA | LOS ANGELES, CA | MANCHESTER BOULEVARD CORRIDOR ROADWAY IMPROVEMENT PROJECT. TO PRESERVE AND REHABILITATE THE EXISTING ROADWAY (GRIND AND OVERLAY) BETWEEN ASH ST AND CRENSHAW BL. | Pavement Improvement | $3,200,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $236,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $551,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,001,000 |
CALIFORNIA | LOS ANGELES, CA | Landscaping and Irrigation, fine grading and adjustment of utilities to grade | Transportation Enhancements | $156,000 |
CALIFORNIA | SACRAMENTO | Place hot mix asphalt on Junction Boulevard, Woodcreek Oaks Boulevard & Eureka Road. | Pavement Improvement | $1,006,173 |
CALIFORNIA | SACRAMENTO | At Douglas & Sierra College Boulevard install E/B & W/B dual left turn lanes, control, ITS cabinet & CCTV camera, relocate medians, micro-pave intersection & restripe/B & W/B Douglas Boulevard. | Other | $521,320 |
CALIFORNIA | SACRAMENTO | Place hot mix asphalt bonded wearing course to North Sunrise, Eureka Road & to Junction Blvd. | Pavement Improvement | $1,125,000 |
CALIFORNIA | SACRAMENTO | Install CMS on N/B Sunrise Avenue south of Cirby Way per ITS Master Plan. | Safety/Traffic Management | $130,630 |
CALIFORNIA | SACRAMENTO | At Sierra College Boulevard & East Roseville Parkway install N/B dual left turn lanes, including median modification & S/B approach restripe. | Safety/Traffic Management | $220,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $392,000 |
CALIFORNIA | TRACY | BESSIE AVE:- 11TH ST TO CARLTON WAY , ROADWAY RECONSTRUCTION | Pavement Improvement | $1,614,306 |
CALIFORNIA | SEASIDE-MONTEREY | Reconstruct between San Lorenzo and Canal Streets | Pavement Improvement | $232,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,363,000 |
CALIFORNIA | LOS ANGELES, CA | AT-GRADE CROSSING IMPROVEMENTS INCLUDING OUTBOUND PRE-SIGNALS, CHANGEABLE MESSAGE SIGNS, LANE RECONFIGURATION AND ROADWAY IMPROVEMENTS INCLUDING NORTHBOUND MODIFICATION OF BUENA VISTA STREET STRIPING | Safety/Traffic Management | $1,250,000 |
CALIFORNIA | LOS ANGELES, CA | MODERNIZE FOUR TRAFFIC SIGNALS ON BUENA VISTA STREET AND ON HOLLYWOOD WAY AND INSTALL FIBER OPTIC COMMUNICATIONS ON MAGNOLIA BOULEVARD | Safety/Traffic Management | $618,000 |
CALIFORNIA | LOS ANGELES, CA | VARIOUS LOCATIONS CITYWIDE . , SIDEWALK REMOVAL & REPLMT, PED RAMP | Transportation Enhancements | $693,000 |
CALIFORNIA | LOS ANGELES, CA | ECONOMIC STIMULUS PROJECT- NORTH BRAND BOULEVARD STREET IMPROVEMENT BETWEEN TRUMAN STREET AND SOUTH CITY LIMIT | Pavement Improvement | $745,000 |
CALIFORNIA | SACRAMENTO | In Colusa, Placer and Sacramento Counties, at various locations. | Pavement Improvement | $7,787,439 |
CALIFORNIA | FRESNO | ON NEES AVE. FROM PEACH TO MINNEWAWA AVENUES , AC OVERLAY/ REHAB. | Pavement Improvement | $350,000 |
CALIFORNIA | LOS ANGELES, CA | CITYWIDE AND TRANSIT VILLAGE PEDESTRIAN IMPROVEMENTS INCLUDING PEDESTRIAN RAMPS | Transportation Enhancements | $1,219,000 |
CALIFORNIA | LOS ANGELES, CA | CITYWIDE AND TRANSIT VILLAGE IMPROVEMENTS THAT CALL FOR THE OVERLAY, REMOVAL AND REPLACEMENT OF STREETS, DAMAGED CURB AND GUTTER, DRIVEWAY, APPROACHES, PARKWAY TREE, CROSS GUTTERS. | Pavement Improvement | $3,217,000 |
CALIFORNIA | LOS ANGELES, CA | AVIATION BL: MARINE AV TO MANHATTAN BEACH BL. , REHABILITATION/RECONSTRUCTION | Pavement Improvement | $464,000 |
CALIFORNIA | LOS ANGELES, CA | VALLEY DRIVE FROM 15TH ST TO SEPULVEDA BL. , REHABILITATION/RECONSTRUCTION | Pavement Improvement | $610,000 |
CALIFORNIA | SAN JOSE, CA | Rehabilitate local street | Bridge Improvement | $2,745,000 |
CALIFORNIA | LOS ANGELES, CA | LAS TUNAS DR. STREET LIGHTING RETROFIT - GREEN/ENERGY SAVING IMPROVEMENT - PEDESTRIAN/SAFETY LIGHTING INSTALLATION | Pavement Improvement | $1,257,000 |
CALIFORNIA | LOS ANGELES, CA | HUNTINGTON DR. FRM SAN MARINO TO SAN GABRIEL. , ST REHAB, LANDSCPE & IRRIGATION | Pavement Improvement | $500,000 |
CALIFORNIA | LOS ANGELES, CA | ROBERTSON BLVD: BURTON WY TO WITHWORTH DR. , ASPHALT OVERLAY | Pavement Improvement | $1,059,000 |
CALIFORNIA | OXNARD-VENTURA | Edge Grinding & Rubberized Asphalt | Pavement Improvement | $400,000 |
CALIFORNIA | Reconstruction of sidewalks and curb cut ramps on 'O' Street from 9th Street to 11th Street. Reconstruction of curb returns with bulb outs and installation of landscape irrigation. | Other | $12,000 | |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $1,446,000 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $174,000 |
CALIFORNIA | LOS ANGELES, CA | PAVEMENT REHABILITATION OF MARIPOSA AVENUE - SEPULVEDA BOULEVARD TO NASH STREET | Pavement Improvement | $358,000 |
CALIFORNIA | LOS ANGELES, CA | Main Street Rehabilitation - Mariposa Avenue to Imperial Highway | Pavement Improvement | $147,000 |
CALIFORNIA | SACRAMENTO | In Yolo County, rehabilitate various roadways. | Pavement Improvement | $730,932 |
CALIFORNIA | SAN FRANCISCO-OAKLAND, CA | Rehabilitate local street | Pavement Improvement | $678,000 |
CALIFORNIA | LOS ANGELES, CA | NEW LANDSCAPE IMPROVEMENTS ADJACENT TO BALLONA CREEK BIKEWAY BETWEEN OVERLAND AVENUE AND PEDESTRIAN BRIDGE/OCEAN DRIVE. | Transportation Enhancements | $476,174 |
CALIFORNIA | LOS ANGELES, CA | WASHINGTON BOULEVARD RESURFACING PROJECT BETWEEN HELMS AVENUE AND LA CIENEGA BOULEVARD. | Pavement Improvement | $670,000 |
CALIFORNIA | LOS ANGELES, CA | GRIND AND OVERLAY 3 INCHES OF ASPHALT ON CULVER BOULEVARD FROM COMMONWEALTH AVENUE TO ELENDA STREET INCLUDING RECONSTRUCTING FAILED ASPHALT AREAS. | Pavement Improvement | $400,000 |
CALIFORNIA | STOCKTON | Rehabilitation of 9 streets in the City of Manteca | Pavement Improvement | $1,356,058 |
CALIFORNIA | LOS ANGELES, CA | NEIGHBORHOOD CITYWIDE SIDEWALK REHABILITATION: REMOVAL AND REPLACEMENT OF CONCRETE SIDEWALKS, DRIVEWAY APPROACHES, AND CURB AND GUTTER. PROJECT AREA IS ALL RESIDENTIAL NEIGHBORHOODS. | Transportation Enhancements | $1,925,000 |
CALIFORNIA | LOS ANGELES, CA | WHITTIER BLVD REVITALIZATION: PHASE II; RECONSTRUCTION OF CONCRETE SIDEWALKS AND OTHER PEDESTRIAN SAFETY IMPROVEMENTS; LANDSCAPING ENHANCEMENT. | Transportation Enhancements | $749,000 |
CALIFORNIA | SEASIDE-MONTEREY | Install new traffic signal at Oak & Front Streets | Safety/Traffic Management | $544,891 |
CALIFORNIA | LOS ANGELES, CA | CRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE | Pavement Improvement | $2,000,000 |
CALIFORNIA | LOS ANGELES, CA | ATLANTIC AVE: FERNWOOD AVE TO MCMILAN AVE . , PAVEMENT REHABILITATION . | Pavement Improvement | $564,871 |
CALIFORNIA | LOS ANGELES, CA | MLK BL: FROM ATLANTIC AVE. TO EAST CITY LIMIT , RECONSTRUCTION SIDEWALK, CURB/GUTTE | Pavement Improvement | $684,580 |
CALIFORNIA | LOS ANGELES, CA | Atlantic Ave work to include pavement improvements, sidewalk, curb ramps, curb and gutter raised median islands. | Pavement Improvement | $399,030 |
CALIFORNIA | LOS ANGELES, CA | Martin Luther King Blvd work to include pavement improvements, sidewalk, curb ramps and drainage improvements. | Pavement Improvement | $492,519 |
CALIFORNIA | OXNARD-VENTURA | Road Rehabilitation, various locations | Pavement Improvement | $400,000 |
CALIFORNIA | LOS ANGELES, CA | THE PURPOSE OF THE ALTERATIONS IS TO ENHANCE PUBLIC SAFETY ON A RAILROAD CROSSING ON BIRCH AVENUE IN THE CITY OF HAWTHORNE. THE PROPOSED ALTERATIONS CONSIST OF THE REMOVING AND REPLACING OF THE PEDES | Pavement Improvement | $35,000 |
Source: FDIC