Browse All Approved Stimulus Highway Projects

Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.

Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.

For more on the stimulus, check out our blog and resource page.

24 / 24
State Urban Area Project Description Improvement Type ARRA Funds Obligated
CALIFORNIA Rehabilitate the existing asphalt pavement without modifying the existing roadway bench width on 5.38 miles of the Wentworth Springs Roads (El Dorado County Road 63)from mile post 1.30 to mile post 6. Pavement Improvement $3,282,240
CALIFORNIA Rehabilitate roadway pavement and drainage structures on approximately 33.3 mile of the Bonnie Claire Road from mile post 7.4 at the junction of Ubehebe Crater Road to mile post 40.7 at the junction w Pavement Improvement $12,025,974
CALIFORNIA Rehabilitate approximately 5.05 miles of roadway, and 2.17 lane miles of paved parking in Yosemite National Park. The project includes the roadway from Chinquapin intersection up to the Badger Pass s Pavement Improvement $8,480,911
CALIFORNIA Rehabilitate roadway to a constant 24 feet total width. Spot improvements for drainage and safety. The south project limit begins at the intersection with California State Route (SR) 20, and proceed Pavement Improvement $4,784,929
CALIFORNIA Rehabilitate roadway pavement and drainage structures on approximately 2.18 miles of two-lane roadway between Costal Drive and Klamath Beach Road on Alder Camp Road in Redwood National Park. Pavement Improvement $3,110,952
COLORADO Recondition and resurface the existing one-way loop road with aggregate surfacing, formalize existing pullouts, create additional small pullouts where there is room, and perform minor drainage improve Pavement Improvement $750,000
COLORADO Design and Environmental services supporting the development of 100% plan sets for the replacement of six small bridges in Cibola National Forest in New Mexico state. Design services are performed in Other $539,949
COLORADO Rehabilitation of the Main Entrance Road from the park entrance at Highway 160 to the Park Point Overlook. The project also includes adding a chip seal on the Main Entrance Road from the Park Point O Pavement Improvement $16,326,406
COLORADO Architect/Engineering design services supporting the development of 100% plan set on project NM 12-1(9) and 70% set plan development on NM PFH12-1(10) for the reconstruction and paving of an existing Other $1,347,768
MAINE 886910 - Guardrail replacement for the 8869.00 PIN. Funding to be stimulus. Safety/Traffic Management $25,528
MINNESOTA 09ES102 - Hedstrom Mill to 0.2 Mi S of Forest Rd 140 (Trout Lk Rd), Pavement Reclamation Pavement Improvement $491,197
MISSISSIPPI Resurface Brooksville Road and Section Line Road. Pavement Improvement $1,726,741
MISSOURI 1167003 - 1" level course from Rte. 60 to Rte. K (Note: Forest Highway ARRA project.) Pavement Improvement $365,139
MONTANA Reconstruct a portion of the Going to the Sun Road in Glacier National Park Phase. Pavement Improvement $20,099,993
MONTANA Rockfall Mitigation for portion of road related to MT PRP GLAC 10(23) Phase 8 Pavement Improvement $9,796
NORTH CAROLINA Replace East Canal Bridge & Central Canal Bridge. Repair Entrance Road Bridge. Resurface Lake Landing Road. Bridge Replacement $1,000,000
NORTH DAKOTA Rehabilitate or chipseal 13.8 miles of the North Unit Scenic Drive of Theodore Roosevelt National Park. The rehabilitation includes full depth reclamation or pulverizing the existing asphalt roadway, Pavement Improvement $7,234,646
NORTH DAKOTA Recondition and resurface Route 11, Lower Lake Road, to a uniform 22 feet width and regravel. Additionally, Lower Lake Parking 1 will be regraveled and a quarter mile of the Munch's Coulee Nature Tra Pavement Improvement $953,000
OHIO 1601002 - Full depth pavement restoration, guardrail and pavement marking. CR 9 8.55-10.89. Includes Forest Highway Funds. Federal Project Number for this Project is OH PFH 16-1(002). ARRA ID 8439 Pavement Improvement $85,662
PENNSYLVANIA Replacement of Toms Creek Bridge along U.S.Route 209 Bridge Replacement $2,050,000
SOUTH CAROLINA Rehabilitate Center Road, Wildlife Drive, North Loop Spur, and Timber Island Road. Pavement Improvement $1,225,660
TENNESSEE Rehabilitate seven roads and four parking areas. Pavement Improvement $1,017,400
TENNESSEE Construct Bridge #2 on the Foothills Parkway Section 8E New Bridge Construction $160,020
UTAH Asphalt surfacing of a previously constructed gravel surfaced roadway on Forest Highway 39 from 5.1 miles south of I-70 from the end of the existing pavement to the Gooseberry Administrative Site. Pavement Improvement $1,961,852
VIRGIN ISLANDS Resurface North Shore Road Pavement Widening $1,940,453
WASHINGTON Exercise an option to pave the newly constructed road. The project is located near Aberdeen, WA. Pavement Improvement $4,446,476
WYOMING MICROSURFACE Pavement Improvement $2,353,763
WYOMING UNDERPASS Transportation Enhancements $250,000
WYOMING RECONSTRUCTION (CONCRETE) Pavement Improvement $10,246,361
WYOMING ENHANCEMENTS/SIDEWALKS/ADA #2 Transportation Enhancements $169,715
WYOMING LEVEL AND OVERLAY Pavement Improvement $3,216,146
WYOMING REHABILITATION Pavement Improvement $2,508,438
WYOMING DEER UNDERPASS Pavement Improvement $1,551,431
WYOMING ADA UPGRADE/REHABILITATION Other $546,671
WYOMING CONSTRUCT RETAINING WALL Safety/Traffic Management $250,000
WYOMING MILL/OVERLAY Pavement Improvement $2,288,477
WYOMING RESTORATION & REHABILITATION Pavement Improvement $3,415,493
WYOMING ENHANCEMENTS Transportation Enhancements $150,000
WYOMING 4R/LEVEL/WIDEN/OVERLAY Pavement Improvement $12,223,783
WYOMING DEER DELINEATORS Safety/Traffic Management $148,117
WYOMING LEVEL AND CHIP SEAL Pavement Improvement $1,458,382
WYOMING LEVEL/OVERLAY/CHIP SEAL Pavement Improvement $1,746,271
WYOMING ADA UPGRADE/REHABILITATION Other $433,698
WYOMING GUARDRAIL Safety/Traffic Management $874,253
WYOMING LEVEL/OVERLAY/CHIP SEAL Pavement Improvement $3,850,460
WYOMING ADA UPGRADE/REHABILITATION Other $322,267
WYOMING ADA UPGRADE/REHABILITATION Other $451,539
WYOMING FLATTEN SLOPE/ GUARDRAIL UPGRADE Safety/Traffic Management $391,600
WYOMING ADA UPGRADE/REHABILITATION Other $576,208
WYOMING RECONSTRUCTION/5 LANE Pavement Widening $11,456,488
WYOMING LEVEL/OVERLAY/CHIP SEAL Pavement Improvement $1,626,740
WYOMING SPRINKLER SYSTEM Transportation Enhancements $55,000
WYOMING ADA UPGRADE/REHABILITATION Other $593,314
WYOMING Reconstruction of Wyoming State Route 71, by grading, draining, and paving along the existing alignment to facilitate installation of 2 drainage structures Pavement Improvement $1,059,545

Source: FDIC